Reference projects of  2010

ALSTOM s.r.o.– Production and supply of spare parts for boiler K4, production and supply of superheater SH4 and spare parts of SH4 snakes from material P91, production and supply of ceiling pipes SH1 for Kafr, Egypt.                                      01/2010

ŠKOLKY Litomyšl spol. s r.o. - Repair of emergency state pressure unit of boiler type PGV-100 exchanged tubes.    02/2010

Tepelné hospodářství Rychnov nad Kněžnou, s.r.o.– Production and delivery of boiler R11,63MW pressure unit. 03/2010

RAVOZ spol.s r.o.– Delivery and assembling of 3 pcs of burners WG 30 N/1-C, power 40 – 350 KW with accessory for natural gas burning, installed on malt roaster RAVOZ, type PS 2000. Change of malt roaster layout. 03/2010                                                                                                   

TENZA a.s.– Production and delivery of pressure unit parts for boiler K4. “General repair of K4 boiler in Heat station Otrokovice a.s.                                                                                                                                                                         06/2010

Moravskoslezské cukrovary a.s. – Production, delivery and assembling of EKO 750kW for boiler K1 and assembling of steel structure for fastening of armatures including safety valves.                                                                                        06/2010

Saint-Gobin Verte s.r.o. – General repair of boiler BK-6,5 t of steam/hour in the boiler room in the factory Verte s.r.o. Litomyšl.                                                                                                                                                                                06/2010

METSO MINERALS, s.r.o. – Project documentation for underground cooling tank, static assessment of hall floor for filtering unit construction in the main hall of iron-foundry.                                                                                                    07/2010

AmpluServis, a.s.Production and delivery of 2 pcs of “register” chambers for Teplárna Frýdek Místek.                                                                                                                                                                                                  07/2010

Tršická zemědělská a.s. – The modernization of hop dryers TA900 and TA1300 in buildings no. 2, 3 and 4. It represented a removal of existing burners and supply and installation of new burners APH-M 25PZ, delivery and assembly of burner interlocking set consisting of a gas filter, valve battery, gas pressure switch, air pressure switch, MRP and PT100 controller. Production and supply of combustion chamber TA 1300.                                                                                    07/2010

Cukrovary a lihovary TTD a.s. – Production and delivery of side walls of the combustor, including disassembly and assembly of pressure unit on boiler K-2.                                                                                                                           07/2010

MŽT Stavitelství a.s. – gasification of OKV Přerov Lověšice. Assembly of EKO and steel structure for fastening of armatures including safety valves.                                                                                                                                    08/2010

Cukrovary a lihovary TTD a.s. – Production, delivery and mounting of 12 pcs of flue-gas preheaters (EKO) for boilers K-2 and K-3. Complete exchange of six EKO blocks on the pressure unit, including chambers between the blocks.  Production of a pressure unit.                                                                                                                                                 08/2010

OPATHERM a.s. - Replacement of an old AST1 MK5 Autoflame automatics for new MINI MK7 on the boilers K1 and K2, including software setting, combustion setting and revision of all regulation and safety units of the boiler burner.             08/2010 

TEPLÁRENSTVÍ TANVALD s.r.o. - Replacement of an old MK5 Autoflame automatics for new MINI MK7 Evolution.        11/2010

ILD CZ s.r.o. - Delivery and installation of a pneumatic transportation of light ashes into filter unit of a brown coal hot water boiler K2, installed in the Aircraft Industries a.s.                                                                                                               12/2010

CTZ s.r.o. - General Repair of the steam boiler Praga 8 t of stem/h by boiler tubes exchange while the boiler drums, lower chambers and steam over-heater remained unchanged.                                                                                                                                                                    12/2010